Show simple item record

[en] PERFORMANCE OF IN-LINE INSPECTION TOOLS AND ITS INFLUENCE ON THE STRUCTURAL RELIABILITY OF CORRODED PIPELINE

dc.contributorJOSE LUIZ DE FRANCA FREIRE
dc.creatorJOSE DE JESUS LEAL CARVAJALINO
dc.date2004-07-12
dc.date.accessioned2022-09-21T21:43:56Z
dc.date.available2022-09-21T21:43:56Z
dc.identifierhttps://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=5171@1
dc.identifierhttps://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=5171@2
dc.identifierhttp://doi.org/10.17771/PUCRio.acad.5171
dc.identifier.urihttps://hdl.handle.net/20.500.12032/42759
dc.description[pt] Neste trabalho apresenta-se a avaliação do desempenho de ferramentas de inspeção em linha (ILI) ou pig instrumentado na medição de defeitos causados por corrosão e estudam-se diferentes métodos para o cálculo da confiabilidade estrutural ou cálculo da probabilidade de falha (POF) de um duto corroído, baseada na análise do relatório do pig. O relatório de inspeção do pig é avaliado através de comparações de seus resultados com as medições dos defeitos feitas por ferramentas de referência (medições em campo). Os erros associados a cada sistema de medição podem ser encontrados a partir de métodos estatísticos como os métodos da raiz do erro quadrático médio, dos estimadores de Grubbs, de Thompson e de Jaech. As medições das duas ferramentas são também avaliadas através de testes estatísticos para a linha de tendência e o coeficiente de correlação linear (r). O número mínimo de medições de campo necessárias para verificar o desempenho do pig no dimensionamento dos defeitos de corrosão é determinado pela implementação de um teste baseado na análise seqüencial. Uma vez que o relatório do pig é avaliado e aceito, a POF de um duto corroído é calculada usando os métodos analíticos de primeira ordem (FORM) e propagação de incertezas, e o método de simulação de Monte Carlo. A POF do duto é calculada em função de modelos de pressão de falha onde suas variáveis são definidas como funções de probabilidade (fdp). No caso das dimensões do defeito, a fdp e seus parâmetros estatísticos são obtidos a partir da exatidão do pig. A comparação entre a POF calculada e a POF admissível permite determinar quando será necessário fazer uma nova re-inspeção. Quando a POF calculada atinge um valor maior que a POF admissível, antes de se completar um tempo desejado para a próxima inspeção, o procedimento desenvolvido permite decidir qual o número de reparos que deverá ser feito para que este tempo seja alcançado.
dc.description[en] This work presents: i) the assessment of in line inspection (ILI) tools performance in the measurement of defects caused by corrosion; ii) differents methods to calculate structural reliability and probability of failure (POF) of corroded pipeline based in the ILI report. The inspection report of the ILI (or instrumented pig) is compared with the the geometry of defects measured by a reference tool (field measurements) and the erros associated to each measurement system are analyzed and assessed from statistical methods. The statistical analysis emploies methods such as the root mean square error/diffrential, and the Grubbs s, Thompson s and Jaech s estimators. The measurements taken by both tools (pig and field) are compared and analyzed through statistical tests that consider the tendency line and the coefficient of linear correlation (r). The minimum number of field measurements necessary to verify the performance of the ILI in sizing of corrosion defects is determined by the implementation of a test based on the sequential analysis. POF of a pipeline is calculated using three different methods: i) first order reliability methods (FORM); ii) propagation of uncertainties and iii) the method Monte Carlo. The POF of the pipeline is calculated as a function of different failure models whose variables (such as pressure, geometric and material parameters) are defined by their probability functions (pdf). The pdf and statistical parameters of the defect dimensions are determined from the accuracy of the pig measurements. The comparison between calculated and acceptable POF allows the determination of next reinspection period. When the calculated POF exceeds the acceptable POF before completing the amount of time desired for the next inspection, the developed procedure allows to know the number of repairs that must be made to reach the desired time when the next ILI will be carried out.
dc.languagept
dc.publisherMAXWELL
dc.subject[pt] PIG INSTRUMENTADO
dc.subject[pt] DUTOS CORROIDOS
dc.subject[pt] CONFIABILIDADE ESTRUTURAL
dc.subject[en] INSTRUMENTED PIG
dc.subject[en] CORRODED PIPELINES
dc.subject[en] STRUCTURAL RELIABILITY
dc.title[pt] DESEMPENHO DAS FERRAMENTAS DE INSPEÇÃO EM LINHA E SUA INFLUÊNCIA NA CONFIABILIDADE ESTRUTURAL DE DUTOS CORROÍDOS
dc.title[en] PERFORMANCE OF IN-LINE INSPECTION TOOLS AND ITS INFLUENCE ON THE STRUCTURAL RELIABILITY OF CORRODED PIPELINE
dc.typeTEXTO


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record


© AUSJAL 2022

Asociación de Universidades Confiadas a la Compañía de Jesús en América Latina, AUSJAL
Av. Santa Teresa de Jesús Edif. Cerpe, Piso 2, Oficina AUSJAL Urb.
La Castellana, Chacao (1060) Caracas - Venezuela
Tel/Fax (+58-212)-266-13-41 /(+58-212)-266-85-62

Nuestras redes sociales

facebook Facebook

twitter Twitter

youtube Youtube

Asociaciones Jesuitas en el mundo
Ausjal en el mundo AJCU AUSJAL JESAM JCEP JCS JCAP