[pt] UM SISTEMA PARA AUXÍLIO NO SEQÜENCIAMENTO DE UM LAMINADOR DE TIRAS A QUENTE EM UMA USINA SIDERÚRGICA INTEGRADA

dc.contributorLEONARDO JUNQUEIRA LUSTOSA
dc.contributorLEONARDO JUNQUEIRA LUSTOSA
dc.contributorLEONARDO JUNQUEIRA LUSTOSA
dc.contributorLEONARDO JUNQUEIRA LUSTOSA
dc.creatorRICARDO ANTONIO RAMOS
dc.date2003-08-11
dc.date.accessioned2022-09-21T21:41:52Z
dc.date.available2022-09-21T21:41:52Z
dc.identifierhttps://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=3762@1
dc.identifierhttps://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=3762@2
dc.identifierhttp://doi.org/10.17771/PUCRio.acad.3762
dc.identifier.urihttps://hdl.handle.net/20.500.12032/42164
dc.description[pt] Esta dissertação apresenta um estudo de caso em seqüenciamento da produção de bobinas de aço em um laminador de tiras a quente com enfornamento a frio das placas de aço. O laminador em questão é o da Companhia Siderúrgica de Tubarão, uma grande usina siderúrgica integrada localizada no estado do Espírito Santo, Brasil. Seu start up está previsto para o segundo semestre de 2002. Num primeiro momento, o problema parece ser de tratamento complexo, comportando-se como um grande problema combinatorial com restrições difíceis de serem representadas. Algumas considerações para um bom seqüenciamento são comuns tanto no forno de reaquecimento quanto no laminador desbastador. Isto permite que as placas possam ser seqüenciadas como se esses dois equipamentos fossem um único estágio (equipamento) para alguns agrupamentos de produtos. Assim, o foco pode ser deslocado para o seqüenciamento no estágio final do laminador, isto é no trem acabador. Inicialmente, a idéia era resolver um modelo da mochila compartimentada para a seleção das placas de aço a serem processadas entre duas trocas consecutivas de cilindros de trabalho do trem acabador e usar algumas heurísticas para seqüenciá-las dentro de cada compartimento (faixa de largura). Um estudo do mix de produção planejado mostrou que, devido à grande variedade e quantidade de ordens, a fase de seleção não era crítica e o seqüenciamento poderia ser feito semimanualmente com ajuda do computador. Para aumentar a vida útil dos cilindros de trabalho, assim como atender a qualidade desejada e a data de entrega prometida, no decorrer de uma boa seqüência de laminação deve ocorrer decréscimo nas larguras e na qualidade superficial, trocas suaves de espessuras e de dureza. O sistema computacional proposto implementa um algoritmo simples que seqüencia lexicograficamente o grupo de produtos a ser laminado de acordo com as prioridades dadas a cada critério de seqüenciamento pelo próprio programador da produção, que pode interagir e trocá-las de acordo com as condições prevalecentes.
dc.description[en] This thesis reports a case study on scheduling the cold charged production of coils in a hot strip mill with start- up planned for the second semester of 2002 at Companhia Siderúrgica de Tubarão, a large integrated steel plant in Espírito Santo, Brazil. At first glance, the problem seems intractably complex, being essentially a very large-scale combinatorial problem with ill-defined and difficult to represent constraints. Considerations on the requirements for good sequencing at the reheating and roughing stages showed that they could be scheduled as a single stage for some groups of products, and in doing so, the focus could be on sequencing the finishing stage. Initially, the idea was to solve a compartmented knapsack model for selecting the slabs to be processed between two consecutive changes of working rolls, and using some heuristics for sequencing within each compartment (width range). Examination of the projected product mix showed that, due to the large number and variety of orders, the selection phase was not critical, and the scheduling could be performed semi-manually with a simple computer aid. For extending the life of the working rolls, as well as attaining the desirable quality and promised dates, a good sequence must present decreasing width and surface quality, increasing promised dates, and smooth changes of thickness and hardness. The proposed computer system implements a simple algorithm that lexicographically sorts the set of products to be rolled according to priorities given to these criteria by the scheduler who can interactively change them according to the prevailing conditions.
dc.languagept
dc.publisherMAXWELL
dc.subject[pt] SEQUENCIAMENTO
dc.subject[pt] PROGRAMACAO
dc.subject[en] SEQUENCING
dc.subject[en] PROGRAMMING
dc.title[en] A COMPUTER SUPPORT SYSTEM FOR SEQUENCING A HOT STRIP MILL IN AN INTEGRATED STEEL PLANT
dc.title[pt] UM SISTEMA PARA AUXÍLIO NO SEQÜENCIAMENTO DE UM LAMINADOR DE TIRAS A QUENTE EM UMA USINA SIDERÚRGICA INTEGRADA
dc.typeTEXTO


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record


© AUSJAL 2022

Asociación de Universidades Confiadas a la Compañía de Jesús en América Latina, AUSJAL
Av. Santa Teresa de Jesús Edif. Cerpe, Piso 2, Oficina AUSJAL Urb.
La Castellana, Chacao (1060) Caracas - Venezuela
Tel/Fax (+58-212)-266-13-41 /(+58-212)-266-85-62

Nuestras redes sociales

facebook Facebook

twitter Twitter

youtube Youtube

Asociaciones Jesuitas en el mundo
Ausjal en el mundo AJCU AUSJAL JESAM JCEP JCS JCAP