Show simple item record

[en] EVALUATING THERMAL PLANTS IN BRAZIL STUDIND THE BEST TIME TO INVEST USING REAL OPTIONS MODELS

dc.contributorJOSE PAULO TEIXEIRA
dc.contributorJOSE PAULO TEIXEIRA
dc.contributorALBERT CORDEIRO GEBER DE MELO
dc.contributorALBERT CORDEIRO GEBER DE MELO
dc.contributorTARA KESHAR NANDA BAIDYA
dc.contributorTARA KESHAR NANDA BAIDYA
dc.creatorLEONARDO LIMA GOMES
dc.date2002-07-25
dc.date.accessioned2022-09-21T21:40:13Z
dc.date.available2022-09-21T21:40:13Z
dc.identifierhttps://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=2772@1
dc.identifierhttps://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=2772@2
dc.identifierhttp://doi.org/10.17771/PUCRio.acad.2772
dc.identifier.urihttps://hdl.handle.net/20.500.12032/41929
dc.description[pt] Até 1997 o Setor Elétrico Brasileiro (SEB) era basicamente um monopólio estatal administrado por empresas federais e estaduais. A partir do segundo semestre de 1997 foram iniciadas as privatizações, e em paralelo a reestruturação do setor. Antes do processo de reestruturação do SEB, o planejamento da expansão da geração era feito de forma coordenada e centralizada, com o objetivo de minimizar os custos de investimento e operação. A expansão da geração era uma variável de decisão do problema. No entanto, um dos pressupostos da reestruturação do setor foi e continua sendo a realização pelo agente privado de grande parte dos novos investimentos em geração e transmissão. Dessa maneira, a decisão sobre a expansão da geração deixa de ser centralizada e passa a depender da disposição de investimento deste agente, acarretando no aumento do nível de incertezas no processo de planejamento. Neste contexto, o presente trabalho visa estudar a dinâmica de investimentos privados em geração termelétrica no Brasil utilizando a Teoria das Opções Reais. A dinâmica de investimentos em termelétricas será estudada em três situações diferentes. Na primeira, será utilizado um modelo de opções reais / análise de decisão para determinar as estratégias de escolha do melhor momento de construção de um empreendimento considerando que há incerteza exógena na expansão da oferta de termelétricas. Na segunda, será utilizado o mesmo modelo para determinar as estratégias de momento de construção de uma termelétrica considerando que há incerteza na demanda, e que a expansão da oferta permanece constante. Na terceira, a expansão da oferta ocorre em resposta às incertezas e à interação entre os agentes. Será utilizado um modelo de opções reais / análise de decisão / teoria dos jogos. Os principais resultados obtidos no trabalho foram os prêmios de risco exigidos pelo investidor para realizar o investimento imediato e a determinação do melhor momento de investimento em função de algumas variáveis do problema. Foi possível comparar as diferentes situações estudadas, mostrando que a concorrência pode atrasar investimentos.
dc.description[en] Until 1997 The Brazilian Electric Sector was basically a monopoly administrated by federal and state enterprises. In the second semester of 1997 it was begun privatizations and the restructuring process. Before Brazilian Electric Sector restructuring process, the planning of generation expansion was made through a centralized program which focus in minimize the investment and operation costs. The generation expansion was a decision variable of the problem. However, one of the assumptions of the restructuring sector process was and continues to be the private agent realization of a big share of the new investment in generation. So, the generation expansion is not more centralized, becoming a variable, which depends of the investment affordability of this agent. In this context, the present thesis studies the private investment dynamics in thermoelectric generation using Real Options. The dynamic of investment in thermal Plants will be studied in three different situations: In the first, it will be used a model of real options / decision analysis to determine the best timing of construction, considering that exists an exogenous uncertainty in the thermal supply expansion. In the second situation, the same model will be used to define the best timing of investment in thermal plants, considering that exists demand uncertainty, and that the supply expansion remains constant. In the third situation, the supply expansion occurs in response of the demand uncertainty evolution and the strategic interactions between the agents. It will be used a real options/ decision analysis/ game theory model. The main results obtained were the threshold contracted prices and the determination of the best time to invest as a function of some problem variables. It was possible to compare the different studied situations, showing that the competition could delay investments.
dc.languagept
dc.publisherMAXWELL
dc.subject[pt] OPCAO REAL
dc.subject[pt] TERMELETRICA
dc.subject[pt] AVALIACAO DE PROJETO
dc.subject[en] REAL OPTION
dc.subject[en] THERMAL PLANTS
dc.subject[en] PROJECT EVALUATION
dc.title[pt] AVALIAÇÃO DE TERMELÉTRICAS NO BRASIL ESTUDANDO O MELHOR MOMENTO DE INVESTIMENTO POR MODELOS DE OPÇÕES REAIS
dc.title[en] EVALUATING THERMAL PLANTS IN BRAZIL STUDIND THE BEST TIME TO INVEST USING REAL OPTIONS MODELS
dc.typeTEXTO


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record


© AUSJAL 2022

Asociación de Universidades Confiadas a la Compañía de Jesús en América Latina, AUSJAL
Av. Santa Teresa de Jesús Edif. Cerpe, Piso 2, Oficina AUSJAL Urb.
La Castellana, Chacao (1060) Caracas - Venezuela
Tel/Fax (+58-212)-266-13-41 /(+58-212)-266-85-62

Nuestras redes sociales

facebook Facebook

twitter Twitter

youtube Youtube

Asociaciones Jesuitas en el mundo
Ausjal en el mundo AJCU AUSJAL JESAM JCEP JCS JCAP