[pt] AVALIAÇÃO DA CAPACIDADE REAL DE GERAÇÃO DE POTÊNCIA REATIVA EM UMA USINA DE GERAÇÃO DE ENERGIA ELÉTRICA

dc.contributorRICARDO BERNARDO PRADA
dc.creatorFRANCISCO CARLOS SANTANNA DA SILVA
dc.date2002-03-26
dc.date.accessioned2022-09-21T21:40:07Z
dc.date.available2022-09-21T21:40:07Z
dc.identifierhttps://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=2472@1
dc.identifierhttps://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=2472@2
dc.identifierhttp://doi.org/10.17771/PUCRio.acad.2472
dc.identifier.urihttps://hdl.handle.net/20.500.12032/41847
dc.description[pt] As curvas de capacidade de geração de potência reativa fornecidas pelos fabricantes são elaboradas em função dos parâmetros de projeto do gerador, e geralmente não consideram as condições de operação da planta e do sistema como fatores limitantes. É sabido que as condições de operação da planta, tais como tensões nominais do terminal do gerador e das barras auxiliares, valores limites dos reguladores de tensão, potência máxima da turbina e dispositivos de limitação e proteção de sub e sobreexcitação podem ser fatores limitantes da capacidade de geração e absorção de potência reativa. Neste trabalho foi elaborado um método e desenvolvida uma ferramenta computacional para identificar a curva de capacidade real de geração de potência reativa para qualquer ponto de operação. Este trabalho pode ser estendido para qualquer gerador, conhecidas as características da usina. Nos estudos de caso apresentados pôde-se verificar que é possível ampliar a capacidade de geração reativa da usina apenas conhecendo seus reais limites, não necessitando portanto, de grandes investimentos para o aumento dessa capacidade.
dc.description[en] They show that different generator loads produce greater heating in different parts of generator. A method is described and a software is presented to evaluate the actual reactive power capability curve considering the operating condition.This paper shows that it is possible to enlarge the reactive power capability only by knowing the actual capability limitations, without raising costs and keeping operation safe.It is important to the generator agent to know its capabilities if it is desidered to provide reactive support as an ancillary service in the new competitive environment.
dc.languagept
dc.publisherMAXWELL
dc.subject[pt] SUPORTE DE POTENCIA REATIVA
dc.subject[pt] DISPONIBILIDADE DE POTENCIA REATIVA
dc.subject[pt] LIMITE DE CAPACIDADE REAL
dc.subject[pt] CONTROLE DE TENSAO
dc.subject[en] REACTIVE POWER SUPPORT
dc.subject[en] ACTUAL CAPABILITY LIMITATIONS
dc.subject[en] REACTIVE POWER RESOURCES
dc.subject[en] VOLTAGE CONTROL
dc.title[en] ACTUAL REACTIVE POWER CAPABILITY EVALUATION IN AN ELECTRICAL POWER PLANT
dc.title[pt] AVALIAÇÃO DA CAPACIDADE REAL DE GERAÇÃO DE POTÊNCIA REATIVA EM UMA USINA DE GERAÇÃO DE ENERGIA ELÉTRICA
dc.typeTEXTO


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record


© AUSJAL 2022

Asociación de Universidades Confiadas a la Compañía de Jesús en América Latina, AUSJAL
Av. Santa Teresa de Jesús Edif. Cerpe, Piso 2, Oficina AUSJAL Urb.
La Castellana, Chacao (1060) Caracas - Venezuela
Tel/Fax (+58-212)-266-13-41 /(+58-212)-266-85-62

Nuestras redes sociales

facebook Facebook

twitter Twitter

youtube Youtube

Asociaciones Jesuitas en el mundo
Ausjal en el mundo AJCU AUSJAL JESAM JCEP JCS JCAP